Setu Bharatam


Objective: The programme aims to ensure road safety by making all National Highways free of railway level crossings, by 2019, by building Railway Over Bridges/ Under Passes. 1500 old and worn down bridges to be improved by replacement/widening/strengthening. 208 Railway Over bridges/Under Bridges to be constructed with an outlay of Rs 20 800 Cr
Achievements:
·        Indian Bridge Management System (IBMS) has been set up to inventories bridges and rate their structural condition so that timely repair and rehabilitation work can be carried out based on the criticality of the structure.
·        Over 1,15,000 bridges have been inventorized so far.